Welcome to Titans Gym Ltd.

All New Clothing Range

We have added a whole page of new products with the new look Titans Gym logo. Ranging from Dickies short sleeve shirts to inexpensive hoodies and T-Shirts there is a high contrast garment for everyone! Check out the new training tops too - fit in while training in the best kitted gym on Merseyside!

There are now 65 products available and all of them are suitable for gym use!

New Equipment Arrives!

The renovation work is complete!

After being closed for just one weekend all of our machines are now completely replaced! We are waiting on just four or five pieces to be delivered and installed within the week and the whole gym has been completely refurbished.

We have more improvements planned over the next few months too! You can expect to read a full report of development as soon as its ready.

Please now take note of our new membership prices :

  • All of the daily rates are now increased by £1, so it is now £3.50 for a single session
  • Monthly membership prices remain the same prices!
  • Due to popular demand we now have an OAP rate of £2.50 per session


3 Day Gym Closure due to Re-equip

The gym will be closed on the following date:

  • Friday February 1st
  • Saturday February 2nd
  • Sunday February 3rd

This closure is unfortunately unavoidable. The recent building work that the gym has been going through is almost complete and these three days of closure will be used for the delivery and installation of the brand new equipment. We apologize for this inconvenience and hope that you understand that its worth the wait!

Dickies Hoodies!

 

We have added a new set of three training tops to our gym wear store! We have two designer Dickies hoodies for men and a Puma training jacket for women with the Titans Gym round logo on the back. Check them out:

 

Designer Titans Gym Hoodies

 

Chrismas Opening Hours

The Christmas opening hours are as follows:

Monday 24th December
(Christmas Eve) 

7:00am until 4:00pm

Tuesday 25th December
(Christmas Day) 

Closed

Wednesday 26th December
(Boxing Day) 

Closed
 Thursday 27th December
10:00am until 4:00pm
 Friday 28th December
10:00am until 4:00pm
 Saturday 29th December
10:00am until 4:00pm
 Sunday 30th December
10:00am until 4:00pm
 Monday 31st December
10:00am until 4:00pm

 Tuesday 1st Jan 2008
(New Years Day) 

Closed
 Wednesday 2nd January 2008
7:00am until 9:00pm

Renovation Progress Update

Just a quick progress update:

Building work
The walls between the weights rooms and the aerobics halls are both now down. There is still some structural work left to be done and once everything had been tidied up a new concrete floor will be poured to level off everything perfectly across the whole gym, leaving one completely open, entirely heavy duty and perfectly level weight lifting area.

Equipment
The equipment is scheduled for delivery for the second week of January at the latest. There is a chance that it may arrive sooner. Until then, the gym will continue to be laid out as it is. Even though the equipment has been rearranged to maximize space efficiency there is still plenty of room to fit a decent session in, so don't worry.

I will be posting more updates as they are required.

New Weights Equipment

We have put together the "final" list of the new weights machines that we will be installing in the gym for 2008. There is a good chance that this list may be added to before the renovations and restocking is complete.

  

Weight Machines 

 
  •  Seated row
  •  45 degree pec dec / pec fly
  • 2 x ab rollers
  •  Ab board
  •  Cable crossover
  •  Hyperextension
  •  Chest pad row
  •  Lat pulldown
  •  Tricep station
  •  Leg extension
  •  Lying leg curl
  • Dip / chin bar
             

Levers & Weights 

 
  •  Decline bench
  •  2 x olympic flat bench
  •  Adjustable include bench
  • Lever narrow lever bench
  •  Super incline lever bench
  •  Seated lever decline bench
  •  Lever chest pad row
  •  Seated shoulder press
  •  Smith machine
  •  Narrow lever shoulder
  •  Lever calf raise
  •  Lever leg extension
  •  Lever preacher curl
  •  4 x Adjustable bench
  •  23 x dumbell pairs (2.5kg to 80kg)
  •  Squat / power rack
  •  45 degree leg press
  •  45 degree hack squat
  •  Lever front squat
  •  Preacher board
  •  Single arm lever row
  •  Lever leg curl
  •  Dead lift / shrug platform

 

We are expecting the equipment to be made and installed ready for the first or second week of January 2008. Until then there will be extensive renovations taking place in the gym including: 

  • Complete redecoration
  • Internal walls removing
  • Additional rubber flooring
  • Rebranding 

PDF    Download the final layout here (1.94 Mb Adobe PDF Format)

Building Work

Titans Gym will be closed this Sunday 18th November 2007 for the first phase of building work. All building works will be completed in 6 weeks time. We are sorry for any inconvenience this may cause over the next 6 weeks but it will be worth it when the new gym is ready at xmas. 

Remodelling and Complete Re-equip

The new equipment for Titans Gym has been announced! 

After two years of planning and dozens of overcome set-backs we are proud to finally announce what we have been promising for so long: our complete re-equip and gym remodelling.

Our plans to generate a large sum to invest into the gym came to fruit two weeks ago. Since then we have had these plans painstakingly drawn up, we have narrowed down our choice of equipment with a little help from many of our members and we can now produly present these images:

The new layout of the gym

Click for a full resolution view (new window)

Read more: Remodelling and Complete Re-equip